Triangles: 131.8k
Vertices: 80.5k
More model informationThe Device allows an automatic calculations of Concrete Maturity Index by tracking changes in fresh concrete temperature over the time. The system leads to effective planning of construction operations, such as: heating, moistening during the pouring process, removal of formworks, etc. Without maturity monitoring, in-place concrete strength is estimated by performing compressive cylinder tests in a laboratory. Relying solely on lab tests requires several specimens and can waste valuable time if a project’s in-place concrete reaches sufficient strength before standard test intervals. In the construction business, time is money.
Comments